Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jan 19, 2023     Closing up the left tank - (4.0 hours)       Category: Fuel Tanks
After putting this task off long enough, I decided to finally close up a fuel tank by installing its rear baffle. This has to be installed with tank sealant to ensure no leaks. Since this has to be done without access to the other side once complete, it must be done "in the blind" and without the ability to touch up any of the beads of sealant on the inside. Additionally, all of the rivets along the sealed areas need to ideally be driven while the sealant is still wet, so you're under a bit of a time pressure once you start.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.